Engine & Turbine Governor Services

Project

So what exactly do our services entail? Our unique client-centred service has won us many faithful customers over our 28 years, here is a selection of some of the projects we have done for them.

Redesign of Steam Turbine Control and New Electronic Actuator

Posted by 4, 15th Mar 2012

Redesign of Steam Turbine Control and New Electronic Actuator

We redesigned a steam turbine control to overcome issues of reliability and safety and provided an electronic actuator drive straight to the steam valve to repace the mechanical hydraulic governor originally in place.

Redesign and Upgrade of Steam Turbine Governor Control System

Posted by 4, 03rd Apr 2012

Redesign and Upgrade of Steam Turbine Governor Control System

We designed and installed a completely new system consisting of a Woodward Peak 150, a Woodward CPC current to pressure converter, Deif Generator Control Package (GPC) units and a HMI package.